Project details:

Brief description of the project:

- Collect documents and data for the project;

- Make hydrographic survey of the project area route;

- Make hydrographic survey of spillways and culverts;

- Carry out statistical & calculation of flood characteristics with repeated periods of 50 years and 100 years, storm surge level reaches the project area;

- Identify existing drainage points; take field survey; calculate and assess drainage capacity based on survey results; and make explanatory reports (English - Vietnamese).

On-Site Pictures:

 

CEFD staff surveyed the hydrographic route in the field

CEFD senior staff provided conducts  of culvert construction projects in the field

The survey area (highlighted in yellow) is in Quang Binh province