Meteorological and hydrological measurement for hydrographic survey for the B&T Wind Farm Cluster Project
- Name of project: Meteorological and hydrological measurement for hydrographic survey for the B&T Wind Farm Cluster Project
- The start time: March-2020
- Completion time: June-2020
- Project location: Quang Binh province
Project details:
Brief description of the project:
- Collect documents and data for the project;
- Make hydrographic survey of the project area route;
- Make hydrographic survey of spillways and culverts;
- Carry out statistical & calculation of flood characteristics with repeated periods of 50 years and 100 years, storm surge level reaches the project area;
- Identify existing drainage points; take field survey; calculate and assess drainage capacity based on survey results; and make explanatory reports (English - Vietnamese).
On-Site Pictures:
CEFD staff surveyed the hydrographic route in the field
CEFD senior staff provided conducts of culvert construction projects in the field
The survey area (highlighted in yellow) is in Quang Binh province