Computing multi-frequency flood discharge options and developing flood maps for downstream – Bung 2 River hydropower plant
admin | 12/02/2020
- Name of project: Computing multi-frequency flood discharge options and developing flood maps for downstream – Bung 2 River hydropower plant
- The start time: April-2016
- Completion time: December-2017
- Project location: Quang Nam province
Project details:
Study on options for multi-frequency flood discharge, post-dam break flood routing computation for Bung 2 River Reservoir
- Selecting models, developing models, computation procedure
- Model validation and calibration
- Coupling 1D-2D model
- Identifying discharge regulation and multi-frequency flood routing (06 frequencies of 0.2% 0.5%, 1%, 3%, 5%, 10%)
Developing flood maps